PROJECTS :

Jasmine St Drainage, Caulfield Sth

CLIENT :

Glen Eira City Council

VALUE :

$2 Million

DESCRIPTION :

The Jasmine Street Drainage Project consisted of over 33 Lm of Open Trench excavation stormwater drainage, with 1850 dia Reinforced Concrete Pipes to assist the capacity of the current stormwater drainage system. There was also over 175 Lm of 1850dia Boring for 1500mm dia J Series Jacking Pipes which Kalow Holdings worked closely with Pezzimenti Trenchless to ensure the drainage line met with Councils specifications and plans. This involved pipe jacking up Hawthorn Road to meet with Junction Pits then pipe jacking under the Tram Tracks on Hawthorn Road to connect pipes and associated pits.

This intricate project was constructed under the supervision and guidance of our Director/Project Manager Eddie Gammell and with the dedication and precision of Pezzimenti Trenchless ensuring that the project requirements were met. This contract was carried out on a tight schedule with minimal delays to Yarra Trams and vehicles.

The Glen Eira City Councils Superintendant was extremely happy in the way that Kalow Holdings Pty Ltd conducted its work operations and with attention to Traffic Management and the safety of the general public and their employees.