PROJECTS :
Stormwater Drainage Duplication Wolseley Crescent, Balwyn North
CLIENT :
Boroondara City Council
VALUE :
$600,000
DESCRIPTION :
The Wolseley Crescent contract involved the duplication of existing 1800Ø pipes with drainage construction of 350m of 1500-1350Ø, 750Ø and 600Ø concrete pipes (with the majority being between 1500 and 1350Ø) to enable drainage system to cope with the high volume peaks in this area. A number of double and triple Grated Side Entry Pits were placed to accommodate these works.