PROJECTS :

Stormwater Drainage replacement High Street, Kew

CLIENT :

Boroondara City Council

VALUE :

$1.3m

DESCRIPTION :

The High Street, Kew Contract was for removal and replacement of around 700 metres of 100 year old brick barrel drains with 1350, 1200 & 1050 dia Reinforced Concrete Pipes.

With the works being carried out in difficult areas, the machinery was restricted in movement with major overhead tram cables as well as power poles requiring stabilisation.

Extensive traffic management was required to maintain work operations with a steady flow of traffic. This project was carried out over a few stages.